Lee County Water Supply Corporation – History

1971  Lee County Water Supply Corporation was established.
1972  Phase I Consisted of four wells, two Standpipes and Distribution lines.
1973  Phase II Addition of two Booster Stations another Standpipe along with distribution lines.
1975  Phase III Construction of two additional Standpipes plus the addition of more distribution lines to serve more area.
1979  Drilled additional well.
1982  Phase IV addition of five additional wells, Upgrade of some existing stations, addition of three new sites, and extensive amount of work on the distribution system.
1990  Phase V All Distribution lines to tie-in parts of four other areas within our service area.
1994  Phase VI Distribution lines to tie-in two additional areas in the system.
1995  Phase VII Merge Paige WSC to Lee County WSC along with Distribution lines to tie-in both systems.
1999  Relocate office to current location at 1598 S. Leon St Giddings, Texas 78942.
2001  Phase VIII Drilled three deep wells and the addition of three 250,000 elevated storage tanks, with additional distribution lines and mains.
2002  Phase IX Addition of larger transmission lines, replace defective and high maintenance areas and loop systems with larger mains. After Phase VIII and Phase IX, Lee County WSC had added and replaced over 160 miles of line.
2009  Merge Ledbetter WSC to Lee County WSC.
2011-2014  Phase X Drill new well, Update four sites, add one cooling tower which will bring Lee County WSC to three cooling towers total, Rebuild critical site that was built in 1972 and the addition of larger main lines and distribution lines to Ledbetter area.
2018 -2019  Phase XI ---- New 12" water main from FM 2239 down County Road 211 tying into main line on FM 448. New 12" line from Serbin Pump Station to FM 2239. This phase also sawthe rehab of all the Ground storage and elevated tanks interiors as well as exteriors.
2018 - 2019  Meter Register replacement ------ Lee County WSC replaced the 3G register with the new 4G digital registers. This was a one year project from March 2018to March 2019.
2019  TXDOT Construction ----- With the dividing of Hwy 290 west from Giddings to Paige, Lee County WSC had to construct new lines in new TXDOT properties along both the north andsouth side of the highway.